The high court said it is a high time that at least big hospitals with 100-bedded facilities or more should have their own Pressure Swing Absorption plants, which should have a capacity of at least two times of their normal requirement.
The high court said it is a high time that at least big hospitals with 100-bedded facilities or more should have their own Pressure Swing Absorption plants, which should have a capacity of at least two times of their normal requirement.